Tuesday, January 14, 2020

Layout progress, 2020-01-14 - filling the gap

As mentioned in the previous post, the gap between the extended road section, which is slightly elevated, and the rails (which are at "ground level") needs filling - this is how it looks now:

Layout: lower station approaches (left side), 2020-01-14

I'll use some GreenMax stone embankment sheeting to cover the transition.

Meanwhile, looking back in the other direction:

Layout: local line to rear of train depot (2020-01-10)

Posted in My Layout
Post a comment
Name:
*
E-Mail:
address will not be displayed
Homepage:
Comment: